Material availability check for production orders

A material availability check answers a practical question before production starts: do you have enough of every required component, at the right time, for this order to run?

Run a free material availability scan

What should a material availability check consider?

For a small discrete manufacturer, the minimum useful check combines four data sets:

The important distinction is that on-hand inventory is not always the same as inventory available to a specific job. Earlier or higher-priority jobs may consume the same component first.

What the free scan does

It allocates supply to production jobs in start-date order and classifies each job as READY, AT RISK or BLOCKED. The calculation is deterministic. Your CSV files stay in your browser.

Why manufacturers check before releasing work

A production order can look feasible while a single component makes it impossible to start or complete. A readiness check exposes the specific component, required quantity, available quantity and shortage before the job reaches the floor.

Do you need a new ERP to do this?

No. Full ERP and MRP systems can provide material availability logic, but a small manufacturer may only need a narrow diagnostic first. The free Material Readiness Scan is designed to work from exports you already have. It does not replace accounting, scheduling, purchasing or your system of record.

Try it with your existing exports

Prepare inventory, BOM and open-jobs CSV files. Incoming purchase orders are optional. The scan runs locally in the browser and lets you export the result.